Vision installation requirements

Note: All dispensers must be supported from below with supplied 4 in - 6 in (10.2 - 15.3 cm) adjustable leg accessory, or equivalent. Do not hang dispenser on flange.

  1. Check that dispenser location meets all requirements in the installation,operation and service manual and cut counter as shown in the illustration below.
  2. Place support blocks in cabinet to raise dispenser to height of 12" (30.5 cm).
  3. Place dispenser in counter onto support blocks.
  4. Attach adjustable legs to dispenser.
  5. Remove support blocks and lower dispenser feet to floor.
  6. Adjust legs for 1/8" (4 mm) clearance between dispenser lip and countertop to verify there is no load on flange.
  7. Apply a bead approximately 1/4" (6 mm) in diameter of NSF-listed silicone sealant (Dow Corning RTV-732 or equivalent) around perimeter of dispenser where it meets counter. Smooth sealant to a 1/8" (4 mm) radius.
  8. Install a PVC drain line with at least 1/4" per foot (20 mm per 1 m) slope. Insulate drain line to prevent condensation.
  9. NOTE: Do not apply excessive heat if any sweating of fittings is necessary. Heat conduction through metal may melt threads in plastic drain. Do not reduce drain line size or tie drains together.
  10. Make electrical connections in accordance with applicable wiring diagrams provided. Provide disconnects within 10 ft (3 m) of dispenser and ice machine for servicing.